Bumble Bee Quad progress

All of the the motors have been installed and connected. The motors were soldered rather than using connectors. This saves weight and reduces the risk of accidental disconnection. The esc’s are a little bigger than standard. They are held in with shrink tubing. The covers may be added later for appearances. The rest of the model has been test assembled to see how everything fits. Unfortunately the esc rx connections need to be lengthened a tiny bit to reach the control board. Everything else is looking good.

20131020-220434.jpg

20131020-220459.jpg

20131020-220509.jpg

20131020-220516.jpg

This entry was posted in Quadcopter and tagged , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *